China Polymer Cast-in-Place Tactile Paving Construction Process - China Supplier
China Polymer Cast-in-Place Tactile Paving Construction Process - China Supplier China Polymer Cast-in-Place Tactile Paving Construction Process - China Supplier China Polymer Cast-in-Place Tactile Paving Construction Process - China Supplier China Polymer Cast-in-Place Tactile Paving Construction Process - China Supplier

Polymer Cast-in-Place Tactile Paving Construction Process

Price:元65 /米
Industry Category: Chemicals
Product Category:
Brand:
Spec:


Contact Info
  • Add:, Zip:
  • Contact: 李想
  • Tel:13223760833
  • Email:

Other Products

Description
Additional Information

Product Advantages: Aesthetic, durable, short construction period, the entire pavement can be formed in one go (cast-in-place tactile paving can be directly laid on the finished pavement, avoiding the hassle of secondary paving typically caused by the obstruction of traditional tactile paving bricks), significantly reducing pavement construction costs and material waste. Various colors and styles are available for flexible customization.







Product Description: Polymer cast-in-place diamond tactile paving is a continuous tactile paving system made from inorganic high-strength polymer materials combined with specialized molds, constructed directly on existing pavements through cast-in-place methods. It is divided into two types: guidance strips and guidance points. Standard widths include 300mm, 400mm, 500mm, and 600mm, with flexible customization available based on actual needs. It forms a permanent bond with asphalt concrete or cement concrete base layers, offering wear resistance, anti-slip properties, stain resistance, and synchronous expansion and contraction with asphalt pavement.

II. Construction Process and Operating Methods

Polymer cast-in-place diamond tactile paving is a new tactile paving technology that can be constructed on-site on traditional black asphalt concrete and gray cement concrete pavements.

2.1 Construction Process

Base layer inspection - Base layer cleaning and treatment - Layout marking - Tape application - Base leveling and mortar spreading - Mold placement - Filling with diamond tactile paving mortar - Leveling and finishing - Curing to specified time - Surface cleaning - Application of sealant for surface sealing - Drying and curing - Inspection and acceptance - Opening to traffic - Final acceptance.

2.2 Construction Equipment and Tools

The diamond tactile paving construction process is relatively simple, requiring only the following equipment and tools: one mixer, one disperser, several tactile paving molds, one material transport vehicle, rolling rollers, specialized serrated rubber screeds and flat rubber screeds, one powerful blower, one generator, brooms, and other general equipment and tools.

2.3 Construction Personnel

One team leader and 5-6 construction workers per group.

2.4 Construction Preparation

4.1 Review drawings and layout marking

Carefully review construction drawings and verify positions on-site one by one. If necessary, mark points and apply tape.

4.2 Material inspection

Polymer cast-in-place diamond tactile paving is an on-site, multi-step, multi-material coordinated construction system. Before construction, ensure material consistency and compatibility. Emulsion materials should show no significant skinning, clumping, or abnormalities; powder materials should be free of clumps. 2.4.3 Trial mixing and sample preparation

Different base layers and environmental conditions can affect the curing time of polymer diamond tactile paving. Therefore, before formal construction, conduct on-site trials strictly following the mix ratio and methods set for batch operations. Proceed with batch operations only after ensuring no significant defects in curing.

2.4.4 Base layer conditions and treatment

The base layer should be solid and clean. Asphalt concrete pavement should be free of bleeding, loose debris, delamination, or aggregate loss.





For cement concrete pavement, the strength should not be less than C25. The surface should be treated by milling, scabbling, grinding, sandblasting, or roughening (for newly poured concrete) to expose the aggregate over a large area. Additionally, apply 1-2 coats of PM-101 penetrating sealant for sealing treatment.



Clean, dry asphalt pavement in good functional condition does not require sealing treatment.

Industry Category Chemicals
Product Category
Brand:
Spec:
Stock: 888888
Manufacturer:
Origin: China / Shanghai / Baoshanqu
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192